19.12.2012
Perm/December 19, 2012. On December 14 Perm Engine Company delivered GTU-10P gas turbine unit with a capacity of 10 mW for the gas booster station (GBS), the UKPG-1AB gas processing plant at the Urengoysky oil and gas field belonging to Gazprom Extraction Urengoy.
This delivery enabled the Perm Engine Company to finish its deliveries for this booster station. All together, Perm engine-builders have made eight GTU-10P gas turbine units for this UKPG-1AB GBS, fulfilling their contract in full and on time.
On the same day, the Perm Engine Company delivered another GTU-10P to the client – the first of three gas turbine units of this capacity that the Perm Engine Company will make in 2013 for the Bednodemyanskoye underground gas reservoir Gazprom UGS.
Alexei Mikhalev, Managing Director of Perm Engine Company:
“The GTU-10P gas turbine units made by Perm Engine Company enjoy stable demand and are successfully operating at gas booster stations and Gazprom underground gas storage sites in locations all over our country, demonstrating their high reliability and efficiency. The delivery of each GTU to Gazprom serves as a reminder that the stable functioning of Russia’s gas transportation system relies on the high-tech products made by our Perm engine-builders.”
Perm Engine Company (PMZ) mass produces aviation engines for civil and military applications, as well as industrial gas turbine units for power stations and gas transportation.
PMZ is part of the United Engine Corporation, a wholly-owned subsidiary of OBORONPROM specializing in engine-building assets.
OBORONPROM is a multi-faceted machine-building group of companies, founded in 2002. It is a part of the Russian Technologies Group of Companies. Its primary activities include helicopter building (Russian Helicopters), and engine-building (UEC).